OMV Petrom to install photovoltaic panels on half of its gas stations

Alina Oprea
OMV Petrom, the largest integrated energy company in South-Eastern Europe, plans to install photovoltaic panels in half of its gas station network by 2025. At the end of 2022, the company had panels in 150 fuel stations, it shows the company's annual report.

Moreover, OMV Petrom wants to double its electric vehicle charging network. At the end of 2022, the company had installed 120 fast and ultra-fast charging points.

Also, the company aims to reduce the intensity of carbon emissions by 30% by 2030 compared to 2019.

"The transition towards reduced and zero carbon emissions. We aim to reduce the intensity of carbon emissions by 30% by 2030 compared to 2019 (2022, preliminary data: 11% decrease compared to 2019). Alternative mobility: the continuation of the expansion of the electric vehicle charging network, with plans to double the existing number of charging points (at the end of 2022: 120 fast and ultra-fast charging points installed). Green energy sources in fuel stations: we plan to install photovoltaic panels in 50% of our network of fuel stations by 2025 (at the end of 2022: panels in 150 fuel stations). Progress in the development of a portfolio of renewable electricity through partnerships. The development of projects in the direction of the production of sustainable fuel for aviation and bio-ethanol of the second generation", the report states.

The company has planned investments of RON 6 billion (€1.2 billion) for this year, approximately 70% higher, mainly dedicated to the Neptun Deep project, the acceleration of projects with low and zero carbon emissions, as well as the planned overhaul of the Petrobrazi refinery.

"The value of the investments is estimated to increase to around RON 6 billion, by approximately 70%, with larger investments mainly dedicated to the Neptun Deep project, the acceleration of projects with reduced and zero carbon emissions, as well as the planned overhaul of the Petrobrazi refinery. Investments require a predictable and stable regulatory and fiscal environment (2022: RON 3.6 billion). As a result of the growing investments, we expect to generate an extended treasury flow before the payment of marginally positive dividends (2022: RON 8.2 billion)", the report also states.

Last year, OMV Petrom made a net profit of RON 10.3 billion (over €2 billion), up 260% compared to 2021, of RON 2.86 billion (over €572 million).

Sales revenues were 136% higher than in 2021, amounting to RON 61.34 billion (€12.2 billion), from RON 26.01 billion (€5.2 billion) in 2021.

The number of employees of the OMV Petrom group decreased by 3%, to 7,742 employees.

In 2022, direct taxes and industry-specific contributions increased almost 4 times to a record value of RON 9.7 billion.

RECOMMENDED
Kärcher invests €100,000 in equipping HQ with PV panels
Energy

Kärcher invests €100,000 in equipping HQ with PV panels

Kärcher, a company in the field of cleaning technology, has invested almost €100,000 in equipping the headquarters inaugurated last year in Pipera with photovoltaic panels. To date, the company has reduced its costs for conventional consumption by approximately 45%.

ProCredit Bank launches the ProGreen loan for photovoltaic panels
Energy

ProCredit Bank launches the ProGreen loan for photovoltaic panels

ProCredit Bank has launched the ProGreen credit for photovoltaic panels intended for individuals. They can get the ProGreen credit for Photovoltaic Panels with no down payment and no fees. The credit is intended for those who want to make the transition to a renewable energy source, while also benefiting from reduced costs on their energy bills.

EnergoBit and Huawei to contribute to the implementation of PV projects
Energy

EnergoBit and Huawei to contribute to the implementation of PV projects

EnergoBit and Huawei Romania signed a Memorandum of Understanding (MoU) for global cooperation for photovoltaic and energy storage projects, within the New International Expo Center 2023, which took place these days in Shanghai. Based on the Memorandum of Understanding, the companies will develop the photovoltaic industry in Romania by strengthening technological innovation, improving the user experience, and developing new use cases.

Schools in Vrancea to be equipped with photovoltaic panels
Real estate

Schools in Vrancea to be equipped with photovoltaic panels

The schools in Vrancea will be equipped with photovoltaic panels. The Minister of Investments and European Projects, Marcel Boloș, and the President of the Vrancea County Council, Cătălin Toma, signed the contract worth a total of €1.2 million for the production of green energy in the county. The contract will finance the project "Investments in electricity production capacities for own consumption at the level of Vrancea County". The project is financed by the Large Infrastructure Operational Program 2014-2020.

Romania requests €400 million to subisidize at-home PV systems
Energy

Romania requests €400 million to subisidize at-home PV systems

Romania requests, through the RePowerEU mechanism, substantial European funds for subsidizing the installation of photovoltaic panels for natural persons. It is about €400 million, the amount that could be included in some kind of complementary program to the program of the Environmental Fund Administration for the installation of photovoltaic panels on residential homes.

Photovoltaic park of 1,050 MW to be built in Romania
Energy

Photovoltaic park of 1,050 MW to be built in Romania

A photovoltaic park with an installed power greater than that of a Cernavodă nuclear reactor will be built in Romania, which reflects the appetite of investors to become players in this market again. George-Sergiu Niculescu, president of the National Energy Regulatory Authority (ANRE), says that when he arrived at ANRE's management, he saw a request for authorization to establish a photovoltaic park of approximately 1,050 MW.

RECOMMENDED FROM THE HOME PAGE
Environment

EU boosts offshore energy goals

EU countries have updated their goals for the deployment of offshore renewable energy up to 2050 in each of the EU's 5 sea basins, with intermediate objectives to be achieved by 2030 and 2040.

Industry

Tauron expands wind portfolio and cets 2035 goals

Tauron has inaugurated the Gamów wind farm in the Silesian province, its 14th onshore wind farm. Located in the Rudnik commune, the site includes 15 turbines with a total capacity of 33 MW.

Real estate

ABB and WorldGBC unite for green buildings in Europe

ABB's Smart Buildings Division has announced a strategic collaboration with the World Green Building Council's (WorldGBC) European Regional Network (ERN) to accelerate sustainable and energy-efficient building practices across Europe.

READ MORE
Green Forum  |  18 December, 2024 at 7:30 AM
Green Forum  |  18 December, 2024 at 7:19 AM